Snowdonia
How many stations does a flood flood, and which work rate sets that number?
The designer answered this directly in a forum thread.
- tonyboydell · Designer · 2015-10-18
The number of stations flooded equals the current excavation work rate.
The designer answered this directly in a forum thread.
The number of stations flooded equals the current excavation work rate.