Snowdonia
On the Bockerlbahn train 24a, does putting 2 wood into the lumber mill give an extra worker?
The designer answered this directly in a forum thread.
- tonyboydell · Designer · 2014-12-27
Yes. Two wood in the lumber mill gives the extra worker. Coal can power the mill as usual, but wood does not count toward excavation-type Contract cards; only Lumber does.