Pipeline
Does a virtual pipeline length from Engineering 1 or 2 count when the expansion's Valuation #4 checks the longest pipeline?
The designer answered yes directly.
- rccourt · Designer · 2022-12-31
Yes. Engineering's virtual lengths count toward the longest-pipeline valuation from the expansion, as they do in end-game pipeline scoring.