Paper Tales
What does the Officine's ability do to Level 2 building costs?
The publisher answered this directly, and the rulebook's Construction rule matches the straight-to-Level-2 case.
- SebCatchup · Publisher · 2018-09-09
- SebCatchup · Publisher · 2019-03-15
- Paper Tales rulebook · Rulebook · Construction
Once the Officine's ability is active, each later building you construct has its Level 2 cost waived. Land cost and Level 1 cost are still paid. Upgrading a Level 1 building later can use the ability, but building straight to Level 2 in one turn still requires both the Level 1 and Level 2 costs.