Can engineers clear a mined road hex on the high ground outside a draw, such as hex 1017?
The designer said the road clearing rule applies to all mined road hexes.
- JohnButterfield · Designer · 2019-06-22
- Brastias · Community · 2019-06-22disagrees
- D-Day at Omaha Beach rulebook · Rulebook · 19.3 Capabilities of Engineer Bases
Yes. The designer says the road clearing rule applies to every mined road hex, not only those at the Pavilion and draws. This is the extended-game engineer base rule.